September 1, 2018 - Roland Chong

Comments are off for this post.

Week 15 & 16 of the build for the new dental surgery.

Combined both weeks 15 and 16 because not much happened over the two weeks. The final touches to the building is slowly being applied, inside and out. The first coat of paint has been added waiting for the joinery to go in before the final coat is applied. All lights still not in as yet but we have power!

On the outside we have the paving work completed and most importantly security cameras including security systems in place. The final coat of paint to be expected sometime next week.

Joinery going in this week and to be completed soon. The space is now shrinking as the joinery go in. I swear the rooms were bigger when the build was only on paper! Nothing like some cupboards to cramp a space.

Shouldn’t be much longer I hope and we will be ready to shift into the new rooms!

Roland Chong

Roland has over 18 years experience as a general dentist. Roland does all aspects of general dentistry with a special interest in prosthodontics (crown and bridge work) and cosmetic dentistry. A member of the International Team of Implantology, Roland is constantly developing his skills by collaborating with international experts.